33 panels in five parts. Open a part to jump straight to the panel you need.
Straight from the mould the tile is grey and the pattern invisible. The chips are cut open, and the colour appears, only after grinding and polishing.
Terrazzo literature uses two vocabularies: one for casting in place, one for factory-pressed tiles. Mix, process and acceptance differ — know which you are reading before comparing numbers.
The JS series is single-layer filter pressing: one metered fill, one mix through the body, chips from face to back. Two-colour double-layer needs a separate double-layer terrazzo tile machine and a second feeder.
Change the mould to change the shape, change the finishing line to change the surface. Kept apart, these two explain how one line covers so many products.
The press only makes a blank; the look and the slip rating come from finishing. Decide the application first, then the surface.
Before buying a machine, the customer picks a material. This table answers who you compete with, and why you win.
The three specification questions buyers ask most. Once settled, mould, tonnage and cost can be worked out.
One machine makes eight products because frame and punch swap out. Change size or thickness and the mould set changes — budget for it up front.
Four parts: main cylinder, punch, frame, ejection. The cylinder supplies tonnage; punch area sets the pressure the tile actually sees.
One stroke does three jobs: squeeze water, release bubbles, draw vacuum. Miss any one and the face will not look dense.
Each type suits a different aggregate and format. Start from the tile you want to make, not from tonnage.
Tonnage on a spec sheet is total output force, not the pressure the tile sees. Density follows face pressure — and that falls with the square of the tile side.
The press decides how dense; these three decide how accurate. Batching, mixing and dosing are the input end of the line.
On one recipe, shade depends on two things: charging order and weighing accuracy. Fix those two and batches stay steady.
One variable shapes the recipe: what shows on the polished face. Powder-heavy reads fine and quiet, chip-heavy reads bold and granular. That is positioning, not skill.
The machine is chosen, the materials are still yours to buy. Change supplier on one recipe and the shade moves a step — the buying list is what people skip.
Terrazzo tile, PC pavers, kerb stone, roof tile, permanent formwork — the first nine steps are much the same. The line splits after curing.This machine is single layer, so it skips step ⑥, the base mix.
A single-layer press repeats eight actions in a fixed order; the length of one cycle is the ceiling on output.
Grinding steps up through the grits and never skips one. The scratches a pass leaves are removed by the next, finer block.
The previous panel covered grits; this one covers how blocks are loaded onto the tile and how the swarf is carried away — the two things that set gloss and abrasive cost.
On one polisher, changing blocks and adding or skipping a polish can move gloss by more than 25 GU. It comes in two stages: blocks set the base, chemistry sets the ceiling.
Cement needs time, water and warmth. Miss one and strength stalls — and the tile will not polish bright.
Beyond the press, handling, stacking and pallets decide whether the rhythm of the line holds together.
Add up installed power and the transformer follows. The table estimates a typical JS-600 single-layer set.
A standard JS-600 line takes about 200 m² over four zones: raw material, production, curing, finished goods. Curing is usually the largest and the most often underestimated.
Four questions set the configuration: product type, largest size, daily output, surface. Answer them and both the layout and the price band fall into place.
The press does not set output on its own. Build the line around it and blanks pile up that the grinder cannot clear — derive real capacity from the grinding line.
This is cost structure, not a quotation. Material, power and labour vary widely — put your own prices in.
For a tender or an export order the first question is which standard the report follows. This panel sets out the standards and the usual performance bands.
Sixty kilos a square metre, and a container is full at twenty-something tonnes. Packing and freight decide how far you can sell.
Figures from published manufacturer data. Match on largest size, target output and surface.
A line is not chosen from a model number. Settle these six and price, lead time and layout come back together.